Login for faster access to the best deals. Click here if you don't have an account.

Scaffolding Couplers quotation Private

1 year ago Multimedia Berkeley   88 views

$ --

  • scaffolding-couplers-quotation-big-0
Location: Berkeley
Price: $ --

Scaffolding Couplers quotation Product Description British Stamping die double scaffolding coupler generally refer to the intermediate connecting parts connecting two components. In construction projects, they are mostly used to fix steel pipe scaffolding with an outer diameter of 桅48mm. Fasteners are divided into right-angle fasteners (cross fasteners and directional fasteners), rotary fasteners (movable fasteners and universal fasteners), butt fasteners (in-line fasteners and direct fasteners), etc. There are many kinds of fasteners, mainly including new fasteners, steel pipe scaffolding fasteners, cast steel fasteners, T-shaped building fasteners, concrete sleeper fasteners, wooden sleeper fasteners, rail fasteners, Vossloh fasteners, malleable steel fasteners , Scaffolding fasteners, railway fasteners, steel stamping fasteners, butt fasteners, rotating fasteners, right-angle fasteners. Product Specification ItemProduct NameTypeThicknessOuter DiameterU.WPC of 20`GP 1Double CouplerPressed4.75mm48.3mm0.82kg25000 2Swivel CouplerPressed4.5*4.75mm48.3mm0.9923500 3Sleeve CouplerPressed3.5mm48.3mm1.0kg20736 4Inner Joint PinPressed4.5mm48.3mm0.7kg35000 5Half CouplerPressed4.75mm48.3mm0.4549000 6Board RetainingPressed4.75mm48.3mm0.56kg35000 7Putlog CouplerPressed4.75mm48.3mm0.57kg35000 ItemProduct NameTypeThicknessOuter DiameterU.WPC of 20'GP 1Double CouplerDrop Forged 48.3mm1.0-0.98kg24000 2Swivel CouplerDrop Forged 48.3mm1.12kg21000 3Sleeve CouplerDrop Forged3.5mm48.3mm0.98--1.0kg21000 4Inner Joint PinDrop Forged 48.3mm1.05kg24000 5Board RetainingDrop Forged4.75mm48.3mm0.61kg35000 6Girder CouplerDrop Forged11.5mm48.3mm1.5215000 7Putlog CouplerDrop Forged4.75mm48.3mm0.61kg35000 Detailed Pictures Features Excellent fracture resistance - all-steel cold-pressed structure is advanced, and all-steel cold-pressed forming, strength and toughness exceed national and international standards, completely eliminating the hidden danger of scaffolding collapse caused by fastener fracture of old cast iron fasteners. Excellent anti-slip - large bonding area It ensures that the steel pipe and the fastener are in a surface-fit state, and the bonding area is the largest, which overcomes the point or line bonding between the old fastener and the steel pipe, and eliminates the hidden danger of the steel pipe slipping, thereby ensuring and improving the overall mechanical performance of the scaffolding. safety performance. Strong anti-stripping - new connection It is ensured that the fastener can always be fixed vertically, correctly and firmly when the steel pipe changes, eliminating the possibility of the steel pipe slipping. Strong rust resistance - passivation treatment The whole piece is passivated and galvanized double anti-corrosion treatment, its anti-corrosion ability is greatly improved, and its life is far longer than that of old fasteners. Fast and Lightweight - Structural Optimization The fasteners are light and beautiful, the loading and unloading speed is increased, and the labor intensity is reduced. Application 1. Before the construction of the fastener-type steel pipe formwork bracket, a construction plan must be prepared, and a relatively strict and careful construction plan must be formulated. If the plan is not formulated well, some unpredictable events may occur during construction. 2. Appearance quality requirements of fasteners. The appearance quality of the fasteners is often checked. If there are cracks, deformations or bolts with slippery threads, the use of fasteners is strictly prohibited; to prevent construction failures and accidents from using these unqualified fasteners. Packaging and Shipping 1 fastener is packed in a transparent plastic bag, 50 pieces are packed in a carton, and then packed in a wooden box. Customers and Exhibition FAQ 1.Q: Are you factory or trader? A: We are factory, manufacturer more than ten years. 2.Q: How about your delivery time? A: About 10 to 20 days after deposit. 3.Q: How about your payment mode and sample? A: Normally by T/T and L/C, it's negotiableScaffolding Couplers quotation website:http://www.ruijiesteelpipes.com/scaffolding/scaffolding-couplers/